    Calculates locally in your browser · IEC 60534 choked liquid service
    Process / control valves

    Control valve in flashing service

    A liquid valve is sized on the square root of differential pressure only while the drop is below the choked value. Past that the flow stops rising: the vena contracta has reached the vapour pressure, the liquid is boiling there, and lowering the downstream pressure further does nothing. Sizing on the full ΔP therefore undersizes the valve.

    FlowChokedServiceFlashingF_F0.937
    Required Cv
    19.0
    sized on the choked drop
    Choked ΔP
    6.96 bar
    9.00 bar available
    Cv if unchoked
    16.7
    1.14× too small
    Cavitation index
    0.94
    flashing, not cavitating
    Where the choke point sits
    The valve stops responding once the vena contracta reaches the vapour pressure — not when the outlet pressure does.
    Cv 19.0
    Where the choke point sits
    TermValueNote
    Flow50.0 m³/has entered
    Upstream pressure10.00 barabsolute
    Downstream pressure1.00 barabsolute
    Available ΔP9.00 barP₁ − P₂
    Vapour pressure1.50 barat the flowing temperature
    F_F0.9370.96 − 0.28√(P_v/P_c)
    Choked ΔP6.96 barF_L²(P₁ − F_F P_v)
    ChokedYesthe drop exceeds the choke point
    Required Cv18.95on the choked drop
    Cv if the full ΔP were used16.67undersized
    Cavitation index σ0.94below 1.5 is a risk

    The downstream pressure is below the vapour pressure, so the liquid flashes in the valve body — this is flashing service, not cavitation. The choked ΔP is 6.96 bar, so the 9.00 bar available is beyond the choke point and the Cv must be sized on the choked drop.

    Inspect the model
    Choose a quick result view, a scaled comparison, or the complete diagnostic set.
    Cv against downstream pressure
    Flat below the choke point — reducing the outlet pressure further buys nothing.
    Cv against downstream pressure0.0007.9215.8423.7631.6839.601 bar1 bar2 bar2 bar4 bar4 bar6 bar6 bar8 bar8 barCv
    Choked against unchoked sizing
    The gap is the error you make by using the full ΔP.
    Choked against unchoked sizing0.0004.478.9413.4217.8922.3618.95Choked sizingChoked sizing16.67Full ΔPFull ΔPCv
    Canonical equations
    The exact relationships implemented by this engine.

    0.96 − 0.28√(P_v/P_c) · Critical pressure ratio factor.

    F_L²(P₁ − F_F P_v) · IEC 60534-2-1.

    Q √(G/ΔP) · Liquid, unchoked.

    Q / (F_L √((P₁ − F_F P_v)/G)) · Liquid, choked.

    engineering methodology

    A clear path from inputs to results.

    A liquid valve is sized on the square root of differential pressure only while the drop is below the choked value. Past that the flow stops rising: the vena contracta has reached the vapour pressure and the liquid is boiling there.

    Step-by-step methodWorked exampleAssumptions explained

    How to use

    1. Enter the flow and both pressures.
    2. Set the vapour pressure and the fluid’s critical pressure.
    3. Choose the valve trim’s F_L.
    4. Read the required Cv and whether the service is choked.

    The formula

    Cv=QFL(P1−FFPv)/GC_v = \frac{Q}{F_L\sqrt{(P_1 - F_F P_v)/G}}

    Reference: IEC 60534-2-1, industrial-process control valves, sizing equations for incompressible fluid flow.

    Worked example

    50 m³/h from 10 bar to 1 bar

    Inputs
    • 50 m³/h, P₁ = 10 bar, P₂ = 1 bar.
    • P_v = 1.5 bar, P_c = 220 bar, F_L = 0.9, SG = 1.
    Calculation path
    1. 1

      The available drop is 9 bar.

    2. 2

      F_F = 0.96 − 0.28√(1.5/220) = 0.937.

    3. 3

      The choked drop is 0.81 × (10 − 1.405) = 6.96 bar.

    4. 4

      Since 9 bar exceeds it, the valve is choked.

    5. 5

      Cv is 50/(0.9 × √(8.595)) = 18.95, against 16.67 from the full ΔP — 14% undersized.

    Result

    Choked · Cv 18.95 · 14% larger than the unchoked answer.

    Interpreting the result

    The choked condition is not a fault — it is a physical limit that every valve reaches at a large enough pressure drop. The engineering response is to size on the choked drop and, if the service flashes, to choose a trim that tolerates it rather than one that erodes.

    Assumptions & limitations

    • Incompressible liquid, single phase at the inlet.
    • A single valve, not a split range.
    • F_L from the trim, not from the installation piping.
    • No flashing allowance for the downstream pipework.

    Frequently asked questions

    What is F_L?

    The liquid pressure recovery factor — how much pressure the trim recovers downstream of the vena contracta. A globe valve is about 0.9, a butterfly about 0.7, and a high-recovery trim chokes earlier.

    Why does the flow stop rising?

    Because the throat reaches sonic velocity for the mixture. Lowering the downstream pressure further cannot increase the mass flow through a choked throat.

    Does the same apply to gas?

    Gas has an analogous choked condition with the critical pressure ratio, but the equation and the coefficients are different — the relief valve page covers the gas case.

    What is the difference between flashing and cavitation?

    Flashing keeps the outlet pressure below the vapour pressure, so the bubbles persist downstream. Cavitation has the outlet above it, so the bubbles collapse in the valve or just after, and that is what damages the trim.

    How do I avoid cavitation?

    Reduce the pressure drop across the valve (a larger valve, or a restriction downstream), use a hardened trim, or use an anti-cavitation cage with staged pressure drop.

    Methodology last reviewed 2026-10-22. Results are informational and not financial or engineering advice — see our disclaimer.