    Calculates locally in your browser · bolt preload and torque
    Structural / connections

    Bolt torque and preload

    A structural bolt works by being stretched: the tension in the shank clamps the joint, and the torque is only the means of getting there. This converts the RCSC minimum pretension into a tightening torque and checks the resulting stress, with the friction coefficient exposed because it is where the uncertainty lives.

    Stress area0.3345 in²Threads/in10Preload scatter±8.4 kip
    Tightening torque
    350 ft·lb
    K = 0.20, 0.750 in
    Target preload
    28.0 kip
    RCSC minimum 28 kip at 100%
    Pretension stress
    83.7 ksi
    70% of the 120 ksi tensile strength
    Service load
    20.0 kip
    50% of tensile capacity
    Bolt working
    The preload is the specification; the torque is only how you get there.
    350 ft·lb
    Bolt working
    QuantityValueNote
    Bolt3/4 in A325high-strength carbon
    Nominal diameter0.750 in
    Threads per inch10coarse series
    Tensile stress area0.3345 in²π/4(d − 0.9743/n)²
    Minimum pretension28 kipRCSC Table J3.1
    Target pretension28.0 kip100% of minimum
    Torque coefficient K0.2000.20 dry, 0.15 lubricated
    Tightening torque350 ft·lbT = K·F·d / 12
    Pretension stress83.7 ksi70% of Fu
    Service stress59.8 ksiapplied load over stress area
    Service utilisation50%of 120 ksi
    Turn-of-nut90°after snugging, RCSC Table 8.1

    Torque is a poor control method because K varies with lubrication, plating and thread condition — the same torque can produce 30% more or less preload. That is why the specification prefers turn-of-nut or a direct tension indicator for critical connections.

    Inspect the model
    Choose a quick result view, a scaled comparison, or the complete diagnostic set.
    Torque against the friction coefficient
    The same preload needs almost four times the torque from K = 0.08 to K = 0.30.
    Torque against the friction coefficient0.000117.60235.20352.80470.40588.000.080.080.100.100.120.120.140.140.160.160.180.180.200.200.220.220.240.240.260.260.280.280.300.30ft·lb
    Torque by diameter
    At the same grade and coefficient, torque rises faster than diameter because the stress area does.
    Torque by diameter0.000200.60401.20601.80802.401003.00100.001/21/2197.925/85/8350.003/43/4568.757/87/8850.0011ft·lb
    Canonical equations
    The exact relationships implemented by this engine.

    T = K·F·d · K about 0.20 dry, 0.15 lubricated.

    A_t = π/4(d − 0.9743/n)² · The thread root, not the shank.

    σ = F/A_t · About 70% of Fu at the RCSC minimum.

    60° to 120° past snug · Depending on length-to-diameter ratio.

    engineering methodology

    A clear path from inputs to results.

    A structural bolt works by being stretched: the tension in the shank clamps the joint, and the torque is only the means of getting there. This converts the RCSC minimum pretension into a tightening torque and checks the resulting stress, with the friction coefficient exposed because it is where the uncertainty lives.

    Step-by-step methodWorked exampleAssumptions explained

    How to use

    1. Choose the bolt diameter and grade.
    2. Set the torque coefficient — 0.20 dry, 0.15 lubricated, 0.12 waxed.
    3. Pick the preload you are targeting as a fraction of the RCSC minimum.
    4. Read the torque, the shank stress and the service utilisation.

    The formula

    T=K F d  ;  At=π4(d−0.9743n)2T = K\,F\,d \;;\; A_t = \frac{\pi}{4}\left(d - \frac{0.9743}{n}\right)^2

    Reference: RCSC Specification for Structural Joints, Table J3.1 for minimum pretension and §8.2 for turn-of-nut; AISC 360 Table J3.2 for tensile strength.

    Worked example

    3/4 inch A325 at the minimum pretension

    Inputs
    • 3/4 inch A325 bolt, 10 threads per inch.
    • Torque coefficient 0.20 (as-received).
    • Target 100% of the RCSC minimum pretension.
    Calculation path
    1. 1

      The tensile stress area is π/4 × (0.75 − 0.9743/10)² = 0.3345 in².

    2. 2

      RCSC Table J3.1 gives a minimum pretension of 28 kip for a 3/4 inch A325 bolt.

    3. 3

      Torque is K·F·d/12 = 0.20 × 28,000 × 0.75 / 12 = 350 ft·lb.

    4. 4

      The pretension stress is 28 / 0.3345 = 83.7 ksi.

    5. 5

      That is 70% of the 120 ksi tensile strength, which is where the specification intends the bolt to sit.

    6. 6

      The scatter on torque control is roughly ±30%, so the achieved preload could be anywhere from 20 to 36 kip.

    Result

    350 ft·lb · 28 kip preload · 83.7 ksi · 70% of Fu.

    Interpreting the result

    Torque is a proxy and a poor one: the same torque on a dry, a lubricated and a galvanised bolt produces three different preloads. That is why the specification controls critical connections by turn-of-nut or a direct tension indicator, and why a torque value should always be quoted with the K factor it assumes.

    Assumptions & limitations

    • Pretension values are the RCSC Table J3.1 minima for A325 and A490 bolts.
    • The torque coefficient K is a single value; in reality it varies with lubrication, plating and thread condition.
    • Tensile stress area uses the coarse thread series.
    • The joint is assumed to be a bearing connection with no prying action.
    • Embedment, relaxation and temperature effects on long-term preload are not modelled.

    Frequently asked questions

    What is the torque coefficient K?

    It lumps together the thread friction and the under-head friction into one number, which is why it is sometimes called the nut factor. It is about 0.20 for as-received fasteners, 0.15 for lubricated ones and 0.12 for waxed, and it is the largest single source of error in torque-controlled tightening.

    What is the tensile stress area?

    The effective area at the thread root, which is smaller than the nominal shank area. It is calculated from the nominal diameter and the thread count, and it is the area the preload and the service stress are divided by.

    What is turn-of-nut?

    Tighten to snug, then rotate the nut a specified fraction of a turn — typically 60° for short bolts and 120° for long ones. Because the thread pitch is known, the rotation directly controls the stretch, and therefore the preload, regardless of friction.

    Why not just tighten to a torque?

    Because the preload you get for a given torque varies by ±30% with friction. For ordinary connections that is acceptable; for slip-critical or seismic connections the specification requires turn-of-nut or a direct tension indicator, which control the preload rather than the torque.

    How much preload should I target?

    The RCSC minimum, which is about 70% of the bolt's tensile strength. Higher preloads improve fatigue and slip resistance but risk yielding during tightening; lower ones let the joint slip and the bolt see the load as shear.

    Methodology last reviewed 2026-10-21. Results are informational and not financial or engineering advice — see our disclaimer.