Overall equipment effectiveness multiplies three ratios: how much of the planned time the machine ran, how fast it ran against its ideal cycle, and how much of what it made was good. Because it is multiplicative, three 90% factors produce 73%, not 90%.
| Factor | Value | Loss |
|---|---|---|
| Availability | 90.0% | 10.0% |
| Performance | 92.6% | 7.4% |
| Quality | 95.0% | 5.0% |
| OEE | 79.2% | 20.8% |
Availability losses are downtime; performance losses are speed and minor stops; quality losses are scrap and rework.
run time / planned time · Planned time excludes breaks and planned maintenance.
(ideal cycle × count) / run time · Capped at 100%.
good count / total count · Scrap and rework both count as loss.
A × P × Q · Multiplicative: a 90/90/90 line runs at 73%.
A clear path from inputs to results.
Overall equipment effectiveness multiplies three ratios: how much of the planned time the machine ran, how fast it ran against its ideal cycle, and how much of what it made was good. Because it is multiplicative, three 90% factors produce 73%, not 90%.
How to use
- Enter planned production time excluding breaks.
- Enter downtime.
- Set the ideal cycle time and the counts.
- Read OEE and the three factors behind it.
The formula
Reference: Total productive maintenance (Nakajima) definition of OEE.
Worked example
480 planned minutes, 48 downtime, 400 units, 380 good
- Planned 480 min, downtime 48 min.
- Ideal cycle 60 s/unit.
- 400 units produced, 380 good.
- 1
Run time: 432 min; availability 90.0%.
- 2
Ideal time for 400 units: 400 min; performance 400/432 = 92.6%.
- 3
Quality: 380/400 = 95.0%.
- 4
OEE: 0.90 × 0.926 × 0.95 = 79.2%.
OEE 79.2% (A 90.0 · P 92.6 · Q 95.0).
Interpreting the result
The multiplicative structure is the point. A line that looks strong on every individual measure — 90% available, 93% fast, 95% good — is running at 79% of its potential. Improving the weakest factor moves OEE most, which is why the loss decomposition matters more than the headline number.
Assumptions & limitations
- Planned time excludes breaks and planned maintenance.
- Performance is capped at 100%; a faster-than-ideal run does not create credit.
- Single machine or line; no buffer or upstream starvation effects.
Frequently asked questions
What is a good OEE?
85% is often quoted as world class. 60% is typical for discrete manufacturing; 40% is common in low-volume plants.
Does OEE measure profitability?
No. It measures equipment effectiveness, not whether the output is wanted or sold.
Should planned maintenance count as downtime?
No. It belongs in planned time, or availability is understated.
Methodology last reviewed 2026-10-21. Results are informational and not financial or engineering advice — see our disclaimer.