Development Feasibility
The residual land value of a development: what is left for the site after build cost, fees and the developer’s profit, once the completed value is known.
| Line | Value |
|---|---|
| GDV | $40,000,000 |
| Build cost | $22,000,000 |
| Fees | $2,640,000 |
| Contingency | $1,100,000 |
| Profit | $8,000,000 |
GDV − build − fees − contingency − profit · The land value.
profit / total cost · The developer’s return.
A clear path from inputs to results.
The residual land value of a development: what is left for the site after build cost, fees and the developer’s profit, once the completed value is known.
How to use
- Set gross development value ($m).
- Set build cost ($m).
- Set professional fees (% of build).
- Set contingency (% of build).
- Read the headline metrics, then check the table for the detail.
The formula
Reference: Residual land value after build cost, fees and profit (Appraisal Institute, The Appraisal of Real Estate).
Worked example
At the default inputs
- Gross development value ($M): 40; Build cost ($M): 22; Professional fees (% of build): 12; Contingency (% of build): 5; Developer profit (% of GDV): 20
- 1
Residual land value: $6,260,000 · Total cost: $25,740,000 · Developer profit: $8,000,000 · Profit on cost: 31.1%
Residual land value: $6,260,000 · Total cost: $25,740,000 · Developer profit: $8,000,000
Interpreting the result
A $40,000,000 scheme costing $22,000,000 to build leaves $6,260,000 for the land.
Assumptions & limitations
- Single-phase development.
- Finance costs excluded.
Frequently asked questions
What is residual land value?
What is left for the site once everything else is paid, including the developer’s profit.
Should finance costs be included?
Yes, in a full appraisal; they reduce the residual.
Methodology last reviewed 2026-10-22. Results are informational and not financial or engineering advice — see our disclaimer.